Planning zone Βδ5
Plan: ΤΟΠΙΚΟ ΣΧΕΔΙΟ ΛΕΜΕΣΟΥ
Industrial / light-industrial zone — ΒΙΟΤΕΧΝΙΚΗ ΖΩΝΗ ΚΑΤ. Β Verified
For industry, workshops and warehouses; the category (A, B, C) shows how much nuisance is allowed.
Development limits
- Building ratio (Σ.Δ.)
- 0.6
- Coverage (Σ.Κ.)
- 0.6
- Floors
- 2
- Height
- —
Example: On a 1000 m² plot in zone Βδ5 you could build roughly 600 m² of floor area with a footprint of up to 600 m². Boundary setbacks, road widening and the plan's conditions can reduce this — see the calculation for your own plot.
Source: DTPH Υπόμνημα Πολεοδομικών Ζωνών (data.gov.cy, 2016), row 131
Find your plotSee what you can build on your own plot — free.
Where this zone appears
- Amathouda, Ag. Athanasios (ΑΜΑΘΟΥΝΤΑ, ΑΓ. ΑΘΑΝΑΣΙΟΣ) · Limassol
- Lemesos, Lemesos (ΛΕΜΕΣΟΣ, ΛΕΜΕΣΟΣ) · Limassol
- Polemidia, Kato Polemidia (ΠΟΛΕΜΙΔΙΑ, ΚΑΤΩ ΠΟΛΕΜΙΔΙΑ) · Limassol